Partnering with factory millwrights to execute precision machinery placements, press installations, and production line tooling upgrades.
Complete workplace safety compliance protects your job site and liability.
We analyze ground bearing pressure, swing radiuses, and rigging configurations beforehand.
All operations strictly adhere to Ontario Ministry of Labour safety guidelines.
We arrive on site with rigging gear pre-selected, minimizing hook delays.
Deploying multi-ton capital assets inside active manufacturing facilities demands extreme mechanical precision, absolute clear radio synchronization, and rigid load chart tracking. Whether dropping an industrial boiler through a roof hatch or aligning heavy automotive stamping dies onto precision anchor systems, we supply the experienced operators and specialized rigging hardware millwrights rely on. We analyze overhead structural barriers, calculate machine weights down to the pound, and deploy low-clearance boom trucks or high-tonnage mobile setups configured to manage uneven centers of gravity without compromising factory floor slabs or structural columns.
Every factory machinery pick follows a disciplined, safety-first sequence engineered to protect your assets, your facility, and your production schedule.
"Ontario Cranes showed up on time, had the lift planned perfectly, and finished 2 hours ahead of schedule. The operator was professional and clearly knew what he was doing. Will be using them again on our next project."
"We've used Ontario Cranes for three major equipment installs now. Consistent, safe, professional every time. They take the pre-lift planning seriously which matters a lot when you're moving heavy industrial equipment."
Answers to the most important questions factory managers and millwright crews ask before booking a precision machinery lift.
Yes, we deploy compact, highly maneuverable boom trucks and low-profile mobile rigs equipped with specialized short-radius configurations engineered specifically for restricted interior factory headroom.
We deploy thick engineered steel or heavy composite outrigger pads to safely distribute machine tracking loads, matching floor slab capacities perfectly before picking high-weight machinery.
We provide complete 24/7 emergency and planned shutdown dispatch coverage, enabling our crews to complete heavy tooling swaps during overnight or holiday windows to save production volume.
We arrive on site with certified spreader bars, high-capacity shackles, adjustable sling configurations, and secondary stabilization taglines specifically selected to manage asymmetrical load centers of gravity without shifting during the pick.
Our team reviews manufacturer weight specifications, performs physical pre-lift balance checks, and uses load distribution formulas to adjust sling lengths and rigging attachment points before the machine ever leaves the ground.
We carry comprehensive hook liability insurance that covers your specific machinery assets throughout the entire lifting cycle, from ground pick to final installation on the anchor system.
Yes, we regularly collaborate with plant millwrights, providing the precise hook control needed to align heavy machinery with precision mounting bolts and anchor systems. Our operators understand the technical demands of multi-machine turnarounds and coordinate directly with your crew leads throughout the entire sequence.
Every operator holds valid, up-to-date Ontario hoisting certifications, maintains full WSIB clearance, and operates in strict accordance with Ministry of Labour safety guidelines. Our entire fleet undergoes regular structural inspections and annual certifications.
Contact our team at (647) 699-2216 or submit your project details through the form on this page. Provide machine weights, facility dimensions, overhead clearance profiles, and your target timeline. Our team will prepare a detailed lift plan and quote promptly.
Our team is standing by to review your machine specs, assess your facility layout, and deploy the right crane asset with a certified operator who knows exactly what they're doing.
Tell our team about your machine weights, facility layout, and project timeline. We'll prepare a detailed lift plan and quote built around your specific manufacturing requirements.